NZ Site Works Ltd
Site levelling by NZ Site Works, Auckland

Home / Services / Site levelling

Site levelling.Level ground,usable space.

Backyards, building pads and sections cut and filled to level, compacted and finished with topsoil.

A level site is where most projects become possible: a lawn you can actually use, a terrace for a patio or pool, a pad for a shed or garage, or a platform a builder can set out on. We cut the high ground, place and compact the fill, and finish to the levels you need.

Backyard levelling is a half-day to two-day job for a compact machine. Building pads and larger cut-and-fill are done with the same care to engineering levels and compaction.

A good fit

  • Sloping or lumpy backyards and lawns
  • Terraces for patios, decks and pools
  • Garage, shed, tank and workshop pads
  • Building platforms to a builder’s or engineer’s levels
  • Reshaping after demolition or clearing

Not this service

  • Planting, turf and paving (we prepare the ground for the trades that do this)

What is included

  1. 01Cut and fill to agreed levels
  2. 02Compaction in layers
  3. 03Drainage falls built in
  4. 04Retaining of the cut where needed
  5. 05Screened topsoil spread for lawn or garden finish
  6. 06Surplus material carted away

Site levellingon site.

Site levelling on site, Auckland: Site levelling by NZ Site Works, Auckland
Fig. 02Site levelling on site, Auckland
Rural pond and spillway: Site levelling by NZ Site Works, Auckland
Fig. 03Rural pond and spillway

Site levelling: common questions

Commonquestions.

Something else? Call 021 105 4874.

Is my backyard too small for a machine?

Usually not. Compact excavators fit through many side gates, and a fence panel can be removed and reinstated if not. Send a photo of the access and we will tell you.

What happens to the extra soil?

It is carted away in our tip truck, or reused on your property as fill where it is suitable.

Will I need a retaining wall?

If the level change at the edge of the cut is more than about 600 mm, some form of retaining is usually the tidy answer. We can build it as part of the same job.

How long does levelling take?

A typical backyard is half a day to two days. Building pads depend on volume and access.

Do you put topsoil back on top?

Yes. We can strip and keep your existing topsoil or supply screened topsoil for a lawn or garden finish.

Free quote

Get aquote.

Tell us about the site levelling job. Photos of the site and the access make the biggest difference.

What happens next

  1. We look at your details and photos.
  2. We arrange a site visit, or price it from the photos if it is simple.
  3. You get a written quote. Nothing starts until you say so.

021 105 4874nzsiteworkslimited@gmail.com

    Photos are resized on your device before sending.

    We read every enquiry ourselves. Prefer to talk? Call 021 105 4874. Our privacy policy explains how we handle your details.

    Call nowGet a quote