
Most building work starts with a hole in the ground, and the quality of that hole decides how smoothly everything after it goes. We excavate to the depths and levels on your drawings, keep the cut clean, manage water and spoil, and hand over a site the next trade can start on.
The same crew and machines handle footings for a single garage and bulk excavation on a multi-lot site, so the approach scales without changing who you deal with.
A good fit
- Footing and foundation excavation to the engineer’s depths
- Building platform and house cut excavation
- Service, drainage and tank excavations
- Pool and spa excavations
- Basement and under-croft dig-outs where access allows
Not this service
- Piling and ground anchors (see Piling for what we do and do not do)
- Work inside a stream margin without resource consent in place
What is included
- 01Set-out from your drawings or levels
- 02Excavation to depth, width and batter
- 03Rock breaking where rock is found
- 04Spoil loaded and carted in our own tip truck
- 05Stormwater managed during works
- 06Trimmed and clean for the next trade
Site excavationson site.


What do you need from me to quote an excavation?
Drawings or levels if you have them, the address, photos of the access, and anything you know about the ground such as a geotech report. If there are no drawings yet, a site visit is usually enough to quote.
Do you cart the spoil away?
Yes. We load and cart in our own tip truck to consented facilities, or move it to another part of your property if you want to keep it.
What happens if you hit rock?
Auckland has basalt close to the surface in many suburbs. We break it out with the right attachment and tell you before the cost changes.
Can you work on a tight or steep site?
Yes. We size the machine to the access, down to compact excavators that fit through a side gate.
How long does an excavation take?
Footings for a house are usually a day or two. Platforms and basements take longer depending on volume, access and cartage distance.
Do I need a consent?
Small volumes generally do not. Larger volumes, depth near boundaries, and work near streams or on steep land can trigger a consent. We will tell you if your job is near a threshold.
Free quote
Get aquote.
Tell us about the site excavations job. Photos of the site and the access make the biggest difference.
What happens next
- We look at your details and photos.
- We arrange a site visit, or price it from the photos if it is simple.
- You get a written quote. Nothing starts until you say so.
Often part ofthe same job.
- 11FoundationsFooting and slab excavation, subgrade preparation and compaction, ready for your builder’s inspection and pour.

- 04EarthworksBulk earthmoving, cut and fill, platforms and accessways for subdivisions, developments and rural properties.

- 03TrenchingService and drainage trenches opened to specification for your electrician, plumber or drainlayer, then backfilled and reinstated.

