
A driveway lasts as long as what is underneath it. We excavate to the right depth, deal with soft spots and water, lay and compact the base in layers, and only then finish in concrete or metal.
Because we do the excavation, the base and the concrete ourselves, there is no gap between the prep crew and the finishing crew, and one quote covers the lot.
A good fit
- New driveways on new builds
- Replacing a cracked or sunken driveway
- Gravel driveways and rural access tracks
- Hardstands, parking pads and turning areas
- Vehicle crossings to council specification
Not this service
- Asphalt surfacing (we prepare for an asphalt contractor)
What is included
- 01Break-out and removal of old concrete or asphalt
- 02Excavation to design depth
- 03Subgrade preparation and soft-spot repair
- 04Base course supplied, spread and compacted in layers
- 05Drainage falls, channel drains and soak pits prepared
- 06Vehicle crossings to council specification
- 07Concrete finishing through our concrete service
Driveway excavationon site.


How much does a driveway cost in Auckland?
Concrete driveways typically run $100 to $200+ per square metre depending on preparation, thickness and finish. A metalled driveway or access track is less. We quote after seeing the site.
How thick should the concrete be?
Around 100 mm with mesh for a typical residential driveway. Shared driveways serving several properties are specified by council at 150 to 175 mm.
Can you just do the excavation and base?
Yes. Concrete and asphalt contractors regularly have us prepare the base to their specification.
What about the council vehicle crossing?
We build crossings to council specification and can advise on the approval needed.
How long does it take?
Most residential driveways take two to five days including excavation, base and concrete, plus curing time before vehicles use it.
Free quote
Get aquote.
Tell us about the driveway excavation job. Photos of the site and the access make the biggest difference.
What happens next
- We look at your details and photos.
- We arrange a site visit, or price it from the photos if it is simple.
- You get a written quote. Nothing starts until you say so.
Often part ofthe same job.
- 13ConcreteSlabs, driveways, patios, paths and crossings placed and finished by the crew that prepared the ground.

- 07Site levellingBackyards, building pads and sections cut and filled to level, compacted and finished with topsoil.

- 03TrenchingService and drainage trenches opened to specification for your electrician, plumber or drainlayer, then backfilled and reinstated.

