NZ Site Works Ltd
Pool excavation by NZ Site Works, Auckland

Home / Services / Pool excavation

Pool excavation.The hole foryour pool.

Excavation for in-ground pools and spas to your pool company’s dig sheet, spoil carted away, access managed.

Pool companies supply the shell and the plumbing. The hole, the access and the spoil are the earthworks, and that is the part we do. We excavate to the dig sheet, including over-dig and the floor profile, keep the sides clean, and have the spoil gone so the crane or truck can get in.

We excavate for pools; we do not install them. Your pool company sets out the position and specification, and we work to it, coordinating the day so the shell goes in straight after the dig where that is the plan.

A good fit

  • Fibreglass pool and spa dig-outs to the supplier’s dig sheet
  • Concrete pool excavations to the engineer’s design
  • Tight-access backyards with a compact machine
  • Spoil removal and site reinstatement

Not this service

  • Supplying or installing the pool, plumbing or filtration (your pool company does this)
  • Pool fencing, decking and paving (we can prepare the ground for them)

What is included

  1. 01Set-out check against the dig sheet
  2. 02Excavation to depth, floor profile and over-dig
  3. 03Access protection, fence panels removed and reinstated
  4. 04Spoil loaded and carted away
  5. 05Base trimmed ready for the pool company
  6. 06Backfill and levelling around the shell where agreed

Pool excavationon site.

Pool excavation on site, Auckland: Pool excavation by NZ Site Works, Auckland
Fig. 02Pool excavation on site, Auckland
Pool excavation, work in progress: Pool excavation by NZ Site Works, Auckland
Fig. 03Pool excavation, work in progress
Pool excavation, Auckland: Pool excavation by NZ Site Works, Auckland
Fig. 04Pool excavation, Auckland

Pool excavation: common questions

Commonquestions.

Something else? Call 021 105 4874.

Do you install the pool as well?

No. We excavate to your pool company’s specification and cart the spoil. The pool company installs the shell and plumbing.

How much spoil comes out of a pool dig?

A typical 8 m by 4 m pool produces roughly 50 to 70 cubic metres of material once it is loosened. That is several truckloads, which is why access and cartage are a big part of the price.

Can you get a machine into my backyard?

Often yes with a compact excavator. We look at gate widths, side paths and anything in the way during the site visit.

Does a pool dig need consent?

The pool itself needs a building consent, which your pool company normally handles. We work within it.

How long does the dig take?

Usually one to two days depending on size, ground and how quickly spoil can be carted off the site.

Free quote

Get aquote.

Tell us about the pool excavation job. Photos of the site and the access make the biggest difference.

What happens next

  1. We look at your details and photos.
  2. We arrange a site visit, or price it from the photos if it is simple.
  3. You get a written quote. Nothing starts until you say so.

021 105 4874nzsiteworkslimited@gmail.com

    Photos are resized on your device before sending.

    We read every enquiry ourselves. Prefer to talk? Call 021 105 4874. Our privacy policy explains how we handle your details.

    Call nowGet a quote