Foundations.Prepared tothe engineer’s levels.
Footing and slab excavation, subgrade preparation and compaction, ready for your builder’s inspection and pour.
A foundation is only as good as the ground under it. We excavate footings and slab areas to the engineer’s drawings, prepare and compact the subgrade and hardfill, and leave the site ready for the builder’s set-out and the council or engineer inspection.
We do the excavation and preparation. The structural design and sign-off belong to your engineer, and we build to what they specify. If you want the concrete placed as well, our concrete crew carries straight on.
A good fit
- Footings and slab excavation for new homes and extensions
- Garage, shed, workshop and tank pads
- Hardfill, compaction and subgrade preparation
- Pole platform and pile hole preparation with our piling service
Not this service
- Structural engineering, design or certification (your engineer)
- Geotechnical testing (we work to the report)
What is included
- 01Set-out from the engineer’s drawings
- 02Footing and slab excavation to depth
- 03Subgrade preparation and soft-spot repair
- 04Hardfill supplied, placed and compacted in layers
- 05Ready for inspection and the pour
- 06Concrete slabs and footings through our concrete service
Foundationson site.



Do you provide the engineering?
No. We work to your engineer’s drawings and specifications and prepare the ground for their inspection. We can introduce you to engineers we work with.
Do you pour the concrete too?
Yes, through our concrete service. One crew carries the job from excavation to a finished slab if you want it that way.
What is hardfill and do I need it?
Compacted granular fill placed under slabs and footings so the concrete sits on a stable, drained base. Most engineers specify it; we place it in layers and compact each one.
What about inspections?
We prepare the excavation for the council or engineer inspection and time the work so it is not sitting open in the rain.
How long does foundation prep take?
Footings for a typical house are one to three days before the pour, depending on size, ground and whether rock is found.
Free quote
Get aquote.
Tell us about the foundations job. Photos of the site and the access make the biggest difference.
What happens next
- We look at your details and photos.
- We arrange a site visit, or price it from the photos if it is simple.
- You get a written quote. Nothing starts until you say so.
Often part ofthe same job.
- 13ConcreteSlabs, driveways, patios, paths and crossings placed and finished by the crew that prepared the ground.

- 01Site excavationsFootings, basements, platforms, services and pools: excavated to depth and level, spoil carted away.

- 12PilingPole and pile holes for retaining walls, decks and pole-platform foundations, excavated or drilled to the engineer’s design.